Bridge demolition will shut A99 and disrupt Munich traffic
The A99 will close in both directions between the Munich-East and Munich-South interchanges from Friday evening until Monday morning for a bridge demolition near Haar, BR reports. Drivers in the Munich region are being advised to avoid unnecessary trips or plan alternative routes.
The bridge carries the B304 over the Munich East Bypass. Although the closure was scheduled for what officials describe as the least busy weekend of the year, Autobahn GmbH expects serious disruption across the region. The motorway usually carries around 100,000 vehicles a day.
Traffic could also be affected in the districts of Erding and Ebersberg. Journeys to the trade fair, the Allianz Arena and the airport may take considerably longer. Munich has warned of severe pressure on city roads. The Mittlerer Ring is an alternative, but it and other smaller roads cannot absorb all the traffic normally using the eastern A99.
Autobahn GmbH recommends postponing non-essential journeys and using buses, trains or trams where possible. Avoiding car trips will also help keep routes clear for police, fire services and emergency crews. Drivers travelling through the region are advised to make a wide detour, as public transport is not a practical alternative for through-journeys.
Authorities plan to divert traffic onto other routes hundreds of kilometres from Munich. Lorries travelling towards the Brenner should take the A7 and A96 from Würzburg, while drivers leaving the Nuremberg area for the south should use the A3 towards Regensburg and Passau. The same routes apply in the opposite direction.
Barrier work will begin at 6 p.m. on Friday, with the full closure starting at 8 p.m. The timing may also affect fans attending FC Bayern Munich’s home match at the Allianz Arena that evening. The motorway is due to reopen before Monday’s morning rush hour.
The bridge will be dismantled gradually by excavators, not demolished by explosives. A replacement is expected to be completed by the end of 2028. A temporary bridge has been available to road users since August.